EPS Testing
There are some extra tests that need to be performed after EPS has been added.
Test 1: Main Switch ON
Section titled “Test 1: Main Switch ON”When the main switch is ON, ensure the current in the neutral conductor is equal to that of the active conductor.
Test 2: Main Switch OFF
Section titled “Test 2: Main Switch OFF”When the main switch is OFF, ensure the current in the neutral conductor is equal to that of the active conductor.
Test 3: Neutral Continuity
Section titled “Test 3: Neutral Continuity”